- Governing document: the VA Physical Security and Resiliency Design Manual (PSRDM), published by VA's Office of Construction & Facilities Management and periodically revised.
- Core mechanism: facilities are classified — Mission Critical facilities carry the most stringent requirements, Life-Safety Protected facilities a reduced set.
- Perimeter content: standoff distances, vehicle barrier requirements at entrances and along accessible perimeters, and progressive-collapse and blast resilience tied to the classification.
- The design tension: anti-ram protection on a campus defined by 24/7 public access, emergency vehicles, and patients on foot.
Why the VA has its own manual
VA operates one of the largest healthcare and benefits estates in the country, and its
facilities do not fit the ISC's office-building mold or DOD's installation model. A VA
medical center must remain a functioning hospital through and after an event — natural or
hostile — which is why the VA folded security and resiliency into a single design manual.
The PSRDM sits alongside the ISC framework for VA-occupied space but goes further where
continuity of care demands it.
Mission Critical vs. Life-Safety Protected
The manual's requirements key off a facility classification made early in planning:
- Mission Critical facilities — typically inpatient medical centers
and facilities whose loss would interrupt essential VA missions — receive the full
requirement set: maximized standoff, perimeter vehicle barriers, hardened construction,
and utility resiliency sized for extended self-sufficiency.
- Life-Safety Protected facilities — outpatient clinics,
administrative buildings and similar — receive a reduced set focused on protecting
occupants long enough to evacuate rather than sustaining operations.
The classification, not the building type alone, drives the perimeter budget. A design
team that assumes “clinic” means “light requirements” before the
classification is confirmed is guessing with the structural frame.
The perimeter on a medical campus
The PSRDM's site chapters translate into familiar engineering: standoff distances to
occupied structures, vehicle barriers — rated to recognized crash test standards — at
vehicle approaches and where parking or roadways come close to Mission Critical buildings,
and controlled entry points. What makes VA work distinctive is the constraint set:
- Open campuses. Veterans, families, and staff arrive around the
clock. Fortress architecture conflicts with the healing mission, pushing designs toward
landscape-integrated barriers: reinforced planters, seat walls, bollard lines with wide
clear spacing for wheelchairs and gurneys.
- Emergency flow. Ambulance routes need barrier-free speed while the
same approach must deny a hostile truck. Active barriers at ambulance entrances carry
operational requirements — cycle time, fail conditions, interlocks — as critical as the
crash rating.
- Phased construction. VA campuses are perpetual construction sites;
temporary perimeters during phasing need their own barrier plan, a detail the manual
addresses and projects routinely underprice.
What the specifier should do
- Confirm the facility classification and the PSRDM edition of record for the project
before sizing any perimeter element — editions change and the deltas are real.
- Specify vehicle barriers in test-standard terms (ASTM F2656 designation plus
penetration rating) and coordinate barrier lines with the blast standoff analysis.
- Design the barrier line for the campus's daily users first — accessibility clearances,
sightlines, snow removal — so security does not degrade into propped-open gates and
bypassed bollards.
Edition check: VA design manuals are revised on their own cycle and projects are typically
bound to the edition cited in their program documents. Confirm the controlling edition
with the VA project team; do not design to a downloaded copy of unknown vintage.
Sources & Further Reading
- U.S. Department of Veterans Affairs, Office of Construction & Facilities Management, Physical Security and Resiliency Design Manual (current edition via cfm.va.gov).
- VA Technical Information Library (TIL) — design manuals, standard details, and master specifications.
- Interagency Security Committee, The Risk Management Process for Federal Facilities — the civilian federal baseline alongside VA criteria.